US-75 DRIVERS: Beginning Monday, April 18, there will be extended lane closures at the Chandler Road interchange on US-75 NB/SB through fall 2022, weather permitting.
Drivers are reminded to slow down and stay alert in work zones, as zipper merges will be utilized and enforced throughout the closures – visit https://bit.ly/NDOTZipperMerge for more information on zipper merges. Closures include:
- Phase 1 (~2 months): US-75 outside lanes closed
- Phase 2 (~2 months): US-75 inside lanes closed
Original source can be found here.